McArthur River Mine dredging
Hall was engaged to dredge approximately 200,000m³ of silt and mud from the approach channel at McArthur River Mine’s Bing Bong Station.
Our team mobilised cutter suction dredge Mabuiag to undertake the dredging works and used a booster pump to transfer the dredged material through a 3km pipeline to the existing disposal ponds.
Client: McArthur River Mining (subsidiary of Glencore)
Location: McArthur, NT, Australia
Start Date: December 2012
Completion Date: June 2013