Whether it’s installing a basic slurry pipeline or a large-scale water supply system, Hall Water & Tailings has the capabilities and qualifications to deliver a variety of polyethylene (PE) and high-density polyethylene (HDPE) piping solutions to the mining and heavy industrial sectors.
Specialising in butt fusion welding, we deliver (but are not limited to):
- Dredging pipelines
- Dewatering pipelines
- Slurry/pump/flow pipelines
- Water transfer and processing pipelines
- Wastewater pipelines
- Dosing pipelines
- Mineral sands pipelines
- Hazardous waste pipelines
- Dust suppression pipelines
- Drainage pits
- Aeration pipelines
- High and low-point drains
- High and low-pressure piping
Owning and operating a range of hydraulic-operated Tecnodue butt welding machines, we are able to weld pipes ranging from 200mm to 500mm in diameter.
For added flexibility, our team members are also experienced in using flange connections when constructing piping systems. This approach is particularly useful on sites with accessibility challenges, as works can be undertaken without the need to transport welding machines.